Notes
Built in the open.
What shipped, what it cost, and what early access is measuring. Facts a reader could check; nothing about who is using it.
6 September 2026
Fifteen phases in eight days.
How Spotter went from a workout logger to a training operating system with a coach loop in eight active days, why every estimate was too pessimistic in the same direction, and what early access will measure.