Spotter

Notes

Built in the open.

What shipped, what it cost, and what early access is measuring. Facts a reader could check; nothing about who is using it.

  1. 6 September 2026

    Fifteen phases in eight days.

    How Spotter went from a workout logger to a training operating system with a coach loop in eight active days, why every estimate was too pessimistic in the same direction, and what early access will measure.